Full internal Category A refurbishment works have been completed, including:
- New reception, common parts, WCs and lobbies
- New male and female showers at lower ground floor level
- New suspended ceilings with perforated metal tiles
- New flat panel LED lighting
- New raised access floors
- Cycle storage with bike repair station
- Upgraded M&E system
- EPC rating of C
- Air quality monitoring
- DDA compliant
- Electric car charging
External works incorporating:
- Restorative clean to all powder coated curtain walling and window frames
- Over spraying entrance door surround in feature colour
- New illuminated signage above the entrance door
- PV cells installed on the roof to power the building with renewable energy